1.    Motiriri Enterprises provides the following data relating to component B97020314.
Cost of raw material                                       N10 per unit
Usage per day                                                 100 units
Minimum re-order period                                20 days
Maximum re-order period                               30 days
Cost of ordering materials                              N400 per order
Carrying cost                                                   10% per annual
Assume that each year consists of 48 working weeks of 5 days per week.
Required: Calculate:
(i) The Re-Order Level       (ii)  The Re-Order Quantity   (iii)  The Maximum Level
(iv)  The Minimum Level     (v) The Average Level
(b)  Write short note on the following terms:
i. Cost        ii. Cost Unit      iii. Cost Centre
(c) List three element of cost known to you.

2. Ajimatanraeje Motors Limited, a car assembly plant buys batteries from an overseas supplier at N20 per battery. Total annual requirement are 25,000 batteries at a rate of 100 per working day. The following cost data are available:
Desired annual return on stock investment N2.
Sundry carrying cost/ unit per year 50k.
Total carrying cost/ unit per year N2.50
Cost of purchase order include clerical cost, stationery, telephone N50.
Average usage 3,000 units per week
Minimum Usage  2,200 units per week
Maximum Usage 4,200 units per week
Re-Order Period  10 14 weeks
Required:
(a) Prepare in tabular form the total annual relevant cost for each of the following order sizes: 250, 500, 1000, 2000, 4000, and 8000.
(b) What is the EOQ for batteries at Ajimatanraeje Motors Limited and why?
(c) The data given above is to be used for calculating the following stock control levels:
i. Maximum Level       ii. Average Level         iii. Minimum Level      vi. Re-Order Level